Construction

Construction or hanging of signs etc. over the aisles are not permitted. All aisles are evacuation routes and must be kept free.

On constructions that build further than 6 meters Kistamässan reserves the right to fit supporting walls at the exhibitors expense.

All constructions that include fittings to the walls or ceilings can only be performed by Kistamässan assigned personnel. For example hanging wires from the ceiling, electricity connections, water & sewage, Internet connections etc.

Evacuation routes, emergency exits, fire equipment, electricity units etc. are not to be blocked and must always be kept free. Kistamässan reserves the right to take down or transport away such constructions at the exhibitors expense.

When using a sawing machine, grinding machine etc. a suction for sawdust must be used.

 
2-level stand

At any construction with two levels, the number of staircases are set by the distance to the nearest staircase. The distance shall not exceed 10 m. Required staircase width is determined by the surface of the upper level, up to 15 sqm leads to a staircase of at least 0,8 m width. For each additional 15 sqm surface an extra 0,8 m staircase width are required. 2 x 0,8 m staircases can be exchanged to a 1 x 1,2 m wide staircase.

Constructions in two levels must meet the Swedish building standard (BBR, BKR) and the special fire and evacuation regulations that the authorities concerned have established. The full responsibility for security and construction lies with the stand builders. Kistamässan take no responsibility for implementing designs and for construction work. Kistamässan has the right to require drawings, etc. concerning the construction. No work may begin on a 2-level stand until Kistamässan have given permission in writing.